UltraDeck ® Decking & Railing Installation Guide world wide web.midwestmanufacturing.
-
Folio 2
Tabular array of Contents: two 4 6 8 9 10 12 14 sixteen 18 20 UltraDeck® Fading Information General Guidelines for Deck Installation Plank Board Installation QuickCap™ Installation Cladding & Endcap Installation General Guidelines for Rail Installation Railing Installation: Method 1 Railing Installation: Method two Railing Installation: Method iii Railing Installation: Height Railing Installation: Fusion® Frequently Asked Questions & Warranty All UltraDeck® products are created from a forest and plastic polymer composit
-
Folio iii
Plank & End Gapping: ! Fig. 1 When installing UltraDeck® decking, gapping guidelines must be followed to ensure that gaps between decking and end gaps allow for proper expansion/contraction, drainage, and the shrinking of treated wood joists that can happen over time. Rustic™, Natural™, & Fusion® For every xvi' of plank, allow a 1/16" gap for every 20°F temperature divergence between the time of board installation and the maximum expected temperature (refer to the end gapping nautical chart, Figure 1).
-
Folio 4
Plank Board Installation: Your installation guide for Rustic™, Natural™, & Fusion® decking Side-to-Side Gapping: When installing decking with a T-Clip, the fasteners will automatically set the side-to-side gapping of the decking. If installing decking using DekMount or surface screwing options (run across Fastening Systems on page 2) a minimum of 3/16" gap will demand to be left between planks. If the temperature is below 40˚ F at the fourth dimension of installation, a 3/8" gap is recommended.
-
PAGE 5
DekMount Installation: 1 Install DekMount onto each joist by screwing a 3/4" premium screw through side pigsty in DekMount. DekMount should be flush on top of the joist and flat confronting the side of the joist. DekMount is easily cut with snips to fit in whatever required length. Stagger DekMount barrel joints so they don't land in the same location on each joist. 12" is recommended for staggering of butt joints. 2 Install deck planks one at a time, from the house or walled construction, working your manner outward.
-
Page 6
QuickCap™ Installation: half-dozen Your installation guide for QuickCap™ decking QuickCap™ Site Preparation: ! ! Check the condition of your current deck to make sure information technology is sound. If whatsoever function of the substructure or the surface is showing decay, make repairs prior to installing the QuickCapTM boards. Whatsoever raised or twisted boards should be fastened down with quality 3" premium deck screws, tightened until the deck surface is level, Figure 1.
-
Page 7
1 Perpendicular installation 2 7/32" to 3/8" Gap '' 16 ane Snap a chalk line, parallel to the existing surface, at 1-1/two" in from the edge of the deck to act as a reference. Add an additional chalk line every 16" to mark the placement of each QuickCap™ fastener. If the chalk line falls in the gap betwixt the existing deck boards, move the line dorsum until the line is at least 3/4" in from the edge of the existing deck boards.
-
Folio 8
Cladding & Endcap Installation: Your installation guide for UltraDeck® Cladding 8 UltraDeck® Cladding: Cladding Dimensions: UltraDeck® NaturalTM and UltraDeck® Fusion®: three/8" x four" x 12' UltraDeck® RusticTM: 7/sixteen" x x-1/2" 10 12' Endcaps are a corking style to protect your UltraDeck® with hollow profiles by helping create a barrier against moisture, dirt, and insect infestation. They tin can provide a make clean, professional person look to end cuts made at a ninety° bending.
-
Folio 9
General Guidelines for Runway Installation: Your installation guide for UltraDeck® Railing Installing UltraDeck® Post Sleeves: ane Cut the UltraDeck® post sleeve to the proper length. 2 Slide the cut UltraDeck® mail sleeve over the 4x4 treated post. When using the UltraDeck® NaturalTM sleeves, be witting of the orientation of the recessed aqueduct then that all posts have the aforementioned appearance.
-
Folio ten
Railing Installation: ten Your installation guide for Rustic™ & Natural™ Method ane Railing Organization: ! i Brand sure the mail sleeve and ring base have been installed. Brand sure postal service is plumb and level. Properly size the top and lower track, and metal insert by measuring the altitude betwixt the 2 post sleeves, and cut to desired length. Make sure the spindles are yet length, measure and cut accordingly. Annotation: It is very of import to verify spindles are even so length.
-
Folio 11
Method 1 Installation: 1 Starting with the post spindle set fifty-fifty with the finish of the insert, continue down the top rails, evenly spacing spindles, making certain to encounter local building lawmaking for spacing. Keep in listen an additional mail service spindle is placed even with the opposite stop of the insert. Measure the altitude between spindles and cut spindle spacer blocks from UltraDeck® spindles for the upper and lower railing.
-
Folio 12
Railing Installation: 12 Your installation guide for Rustic™ & Natural™ Method two Railing Organisation: ! i Make sure the postal service sleeve and ring base have been installed. Make sure postal service is plumb and level. Properly size the top and lower rail, and metal insert past measuring the distance between the ii mail service sleeves, and cutting to desired length. Makes sure the spindles are all the aforementioned length, measure and cut accordingly. Cutting a 6" slice of metallic insert for the support block associates.
-
Page xiii
Method 2 Installation: 1 Starting with the post spindle, ready even with the finish of the insert, go on downwardly the tiptop rail, evenly spacing spindles, making certain to come across local building lawmaking for spacing. Go on in mind an additional mail service spindle is placed even with the opposite end of the insert. Pre-drill holes on the metal insert with a ane/4" drill bit, aligning the middle of the spindles to the center of the metallic handrail insert.
-
PAGE 14
Railing Installation: 14 Your installation guide for Rustic™ & Natural™ Method three Railing System: ! i If using cladding, information technology should exist installed before railing. Lag bolts must exist countersunk to allow for post sleeve. Make certain the notched mail sleeves accept been installed. Brand sure the post is plumb and level. Properly size the top rail and insert by measuring the altitude between the ii mail sleeves, and cut to desired length. Make sure the spindles are all the aforementioned length, measure and cutting appropriately.
-
PAGE 15
Method iii Installation: 1 Install cladding (if desired). See page eight for cladding installation. Install U-Top-It Posts onto joist and flat against cladding with two countersunk lag bolts and boosted nailer boards if decking needs to be cutting. 2 Cut post sleeves to match U-Tiptop-Information technology Posts. A minor slice of cladding may be used to finish the bottom of the U-Top-It Postal service. 3 Evenly space the spindles on the sized metal insert to meet local building code.
-
PAGE sixteen
Railing Installation: sixteen Your installation guide for Pinnacle Pinnacle Railing System: ! i Brand sure the postal service sleeve and ring base have been installed. Make sure the post is plumb and level. Properly size the upper and lower rail and the top cap by measuring the altitude between the two post sleeves, and cut to desired length. Make certain the spindles are even so length, mensurate and cut accordingly. Note: It is very important to verify spindles are withal length. Mensurate and cutting accordingly.
-
Folio 17
Pinnacle Installation: one Evenly infinite the spindles across the upper and lower railing, leaving infinite at both ends for brackets, and meeting local building code for spacing. Pre-drill holes with a 1/viii" drill chip onto the railings where the spindles will exist attached. The vertical sections of both the upper and lower rail will face the outside of the deck or steps. 2 Working from the center towards the ends, adhere the spindles using 3-one/2" premium deck screws.
-
Folio xviii
Railing Installation: eighteen Your installation guide for Fusion® Fusion® Railing System: ! i Make sure the post sleeve and band base have been installed. Make sure the mail is plumb and level. Properly size the upper and lower track and the top cap by measuring the altitude between the ii post sleeves, and cut to desired length. Make sure the spindles are yet length, measure and cut appropriately. Note: It is very of import to verify spindles are still length. Measure out and cut accordingly.
-
PAGE xix
Fusion® Installation: ane Starting with the postal service spindle prepare fifty-fifty with the end of the insert, continue downward the meridian rail, evenly spacing spindles, making sure to meet local building lawmaking for spacing. Keep in mind an additional post spindle is placed fifty-fifty with the contrary end of the insert. ii On each stop of the spindles, pre-drill the center, using a 1/8" drill bit to avoid splitting. The ii mail spindles volition need to be pre-drilled to attach the completed track to the post sleeves.
-
PAGE twenty
Often Asked Questions: What are the dimensions of the deck boards? UltraDeck® Rustic™: 1" H x 5-three/16" W UltraDeck® Natural™: 1-one/16" H x four" W ® ® UltraDeck Fusion : i" H x 5-3/16" West UltraDeck® QuickCap™: i/ii" H 10 3-1/2" West What are the weights of the deck boards? UltraDeck® Rustic™: two.1 lbs. per lineal ft. UltraDeck® Fusion®: two.ane lbs. per lineal ft. xx UltraDeck® Natural™ Radius Border: 1-i/16" H ten 5-3/sixteen" W UltraDeck® Natural™: ane.1 lbs. per lineal ft. UltraDeck® Natural™ Radius Edge: ane.4 lbs.